• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0047

Lessons Learned - Mercoid Pressure Switch; Inadvertent Water Deluge Activation

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1991

Abstract: Description of Driving Event:
The primary cause of the mishap was an activation (closing) of the fire pump mercoid pressure switch which prematurely started the fire pump. This produced transient pressures that exceeded the 2:1 mechanical advantage of the deluge valves, forcing them open. The switch activation was caused by potable water system pressure fluctuations external to the local facility.
URI: http://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/201818
Subject: Facilities
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (12.99Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0047

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T18:19:07Z
date available2017-09-04T18:19:07Z
date copyright33591
date issued1991
identifier otherAFYCQCAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsery=autho162s7D8308/handle/yse/201818
description abstractDescription of Driving Event:
The primary cause of the mishap was an activation (closing) of the fire pump mercoid pressure switch which prematurely started the fire pump. This produced transient pressures that exceeded the 2:1 mechanical advantage of the deluge valves, forcing them open. The switch activation was caused by potable water system pressure fluctuations external to the local facility.
languageEnglish
titleNASA-LLIS-0047num
titleLessons Learned - Mercoid Pressure Switch; Inadvertent Water Deluge Activationen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1991
contenttypefulltext
subject keywordsFacilities
subject keywordsFire Protection
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian