• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  •   YSE
  • Industrial Standards
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

ASHRAE 188 ADD D

English -- Legionellosis: Risk Management for Building Water Systems

Organization:
ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
Year: 2017

Abstract: Scope: FOREWORD This addendum revises Sections 4, 7 and 8. Section 4.1, “Building Designer Requirements,” now specifies that a building designer shall review the building design, and the requirement to survey a new building design has been removed. The requirement to delineate the height of either the discharge outlet or makeup valve relative to the overflow of the tower basin has been removed from Section 7.2.7, “Location of Cooling Tower Makeup Valve.” The requirement for the designer to provide detailed instructions for the commission of all building water systems has been removed from Section 8.4, “Commissioning.” Note: In this addendum, changes to the current standard are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes.
URI: http://yse.yabesh.ir/std;jsessionid=435F2D89F77216F55ECC40BAF539160F/handle/yse/235563
Collections :
  • ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
  • Download PDF : (714.8Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    ASHRAE 188 ADD D

Show full item record

contributor authorASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.
date accessioned2017-10-18T11:08:45Z
date available2017-10-18T11:08:45Z
date copyright2017.01.28
date issued2017
identifier otherVUTEXFAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std;jsessionid=435F2D89F77216F55ECC40BAF539160F/handle/yse/235563
description abstractScope: FOREWORD This addendum revises Sections 4, 7 and 8. Section 4.1, “Building Designer Requirements,” now specifies that a building designer shall review the building design, and the requirement to survey a new building design has been removed. The requirement to delineate the height of either the discharge outlet or makeup valve relative to the overflow of the tower basin has been removed from Section 7.2.7, “Location of Cooling Tower Makeup Valve.” The requirement for the designer to provide detailed instructions for the commission of all building water systems has been removed from Section 8.4, “Commissioning.” Note: In this addendum, changes to the current standard are indicated in the text by underlining (for additions) and (for deletions) unless the instructions specifically mention some other means of indicating the changes.
languageEnglish
titleASHRAE 188 ADD Dnum
titleEnglish -- Legionellosis: Risk Management for Building Water Systemsen
typestandard
page6
statusActive
treeASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc.:;2017
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian