Defence Standards: Recent submissions
Now showing items 501-520 of 43216
-
A-A-59666B
Abstract: This commercial item description (CID) provides the acquisition requirements for the purchase of empty compressed gas cylinders to be used for storage, transportation, and distribution of low pressure liquefied compressed ...Subject(s) : Aluminum , Fire extinguishing , Liquefied , Petroleum , Refrigerant , Steel , -
A-A-59003/3
Abstract: This Commercial Item Description covers the detailed requirements for an audio frequency amplifier control group type AN/SIA-116, for transmission of one-way, 1MC general announcing circuit and two-way 7MC ship's control ... -
W-C-596/40D
Abstract: The General Services Administration has authorized the use of this federal specification sheet by all federal agencies.
The complete requirements for procuring the connectors described herein shall consist of this ... -
NASA-LLIS-1743
Abstract: Abstract:
Mars Exploration Rover met and exceeded mission requirements despite a largely single string spacecraft architecture. Balance the risk of a single string flight system with effective risk ...Subject(s) : Additional Categories. , Additional Categories.Environment , Additional Categories.Flight Equipment , Additional Categories.Flight Operations , Additional Categories.Hardware , Additional Categories.Payloads , Additional Categories.Risk Management/Assessment , Additional Categories.Software , Additional Categories.Spacecraft , Additional Categories.Test Facility , Engineering Design (Phase C/D). , Engineering Design (Phase C/D).Lander Systems , Engineering Design (Phase C/D).Robotics , Engineering Design (Phase C/D).Spacecraft and Spacecraft Instruments , Missions and Systems Requirements Definition. , Missions and Systems Requirements Definition.Level 0/1 Requirements , Missions and Systems Requirements Definition.Planetary entry and landing concepts , Missions and Systems Requirements Definition.Requirements critical to costing and cost credibility , Program Management. , Program Management.Acquisition / procurement strategy and planning , Program Management.Contractor relationships , Program Management.Program planning , development , and management , Program Management.Risk management , Safety and Mission Assurance. , Safety and Mission Assurance.Early requirements and standards definition , Safety and Mission Assurance.Reliability , Systems Engineering and Analysis. , Systems Engineering and Analysis.Mission and systems trade studies , Systems Engineering and Analysis.Mission definition and planning , -
SMD-5962-97526 REV C
Abstract: This drawing documents two product assurance class levels consisting of high reliability (device classes Q and M) and space application (device class V). A choice of case outlines and lead finishes are available and are ... -
DODD 1400.25 VOL 922
Abstract: PURPOSE
a. Instruction. This Instruction is composed of several volumes, each containing its own purpose. The purpose of the overall Instruction, in accordance with the authority in DoD Directive 5124.02 (Reference ... -
SMD-5962-88749 REV A
Abstract: This drawing describes device requirements for MIL-STD-883 compliant, non-JAN class level B microcircuits in accordance with MIL-PRF-38535, appendix A.Intended Use: Microcircuits conforming to this drawing ... -
MIL-DTL-2212J
Abstract: This specification covers alternating current (AC) and direct current (DC) motor controllers and associated switching devices. Included are manual and magnetic controllers, controller parts, limit switches, pressure switches, ... -
NASA-TR-R-428
Abstract: A method for determining the lift, drag, and pitching moment for wings which have separated flow at the leading and side edges with subsequently reattached flow downstream and inboard is presented. Limiting values of the ...Subject(s) : AERODYNAMIC , BOUNDARY , CHARACTERISTICS , COEFFICIENTS , CONTROL , EDGES , FLIGHT , FLOW , LAYER , LEADING , REATTACHED , RECTANGULAR , SEPARATION , SPEED , SUBSONIC , WINGS , -
MIL-F-8815/22A
Abstract: This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defense.
The complete requirements for ... -
NASA-LLIS-1529
Abstract: Abstract:
When a GSE power meter registered zero due to an AC power glitch, the test monitoring and control software interpreted this as a loss of power and increased the test level past the maximum ...Subject(s) : facility power , fault protection , Flight Operations , Ground Equipment , Hardware , High Power RF Breakdown Facility , Payloads , power limits , RF breakdown , RF test , Software , Spacecraft , Test & Verification , Test Article , test failure , test overstress , test software , test-induced failure , -
SMD-5962-84079 REV F
Abstract: This drawing describes device requirements for MIL-STD-883 compliant, non-JAN class level B microcircuits in accordance with MIL-PRF-38535, appendix A. Intended Use: Microcircuits conforming to this drawing ... -
MIL-STD-3046
Abstract: This standard defines Configuration Management (CM) requirements for US Army acquisition programs which apply throughout the lifecycle of systems and their Configuration Items (CIs) and provides the principles to acquire ...

درباره ما