• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0347

Lessons Learned - Impact of Industrial Mergers/Key Management Changes

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1994

Abstract: Abstract:
When a contractor was absorbed by a second contractor early during the performance of the Mars Observer contract, the new contractor's management implemented methods that were not consistent with the original, agreed upon plans for integration and test. This created problems between JPL and the new contractor management.
Reconfirm the contract should major changes occur in the contractors organization, document critical technical and programmatic agreements, and revalidate agreements when changes in key personnel occur.
URI: https://yse.yabesh.ir/std/handle/yse/105850
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.18Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0347

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:42:33Z
date available2017-09-04T16:42:33Z
date copyright34628
date issued1994
identifier otherVSAEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/105850
description abstractAbstract:
When a contractor was absorbed by a second contractor early during the performance of the Mars Observer contract, the new contractor's management implemented methods that were not consistent with the original, agreed upon plans for integration and test. This created problems between JPL and the new contractor management.
Reconfirm the contract should major changes occur in the contractors organization, document critical technical and programmatic agreements, and revalidate agreements when changes in key personnel occur.
languageEnglish
titleNASA-LLIS-0347num
titleLessons Learned - Impact of Industrial Mergers/Key Management Changesen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1994
contenttypefulltext
subject keywordsAdministration/Organization
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian