• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 4-214-02 CHANGE 1

ARMY TACTICAL EQUIPMENT MAINTENANCE FACILITIES (TEMF)

Organization:
UFC - Unified Facilities Criteria
Year: 2003

Abstract: Purpose.
This document consolidates into one source the uniform criteria for the planning, design, solicitation, proposal evaluation, and construction of Tactical Equipment Maintenance Facilities. and associated support requirements. It also contains guidance on the use of negotiated, two-phase, designbuild procedures for procurement of new and/or renovated facilities. It provides U.S. Army Corps of Engineers (USACE) Project Architects/Project Engineers (PA/PE), Project Managers (PM) and Major Army Command (MACOM) planners with a single source to guide the process of planning, developing, and executing projects utilizing competitively negotiated source selection processes.
Organization.
This document is organized in two volumes. The first volume, this document, is the Project Management Manual which describes the process of planning, developing, and executing a two phase design-build project. Reference materials supporting the source selection process are provided in the appendices. The second volume is a generic model Request for Proposals (RFP) to be used in developing solicitations. The generic model follows the USACE Standard Contract Format for construction prescribed by EFARS 14.201-1(a)(1), (reference 1-1). The generic model STATEMENT OF WORK (SOW) in Volume II, contains the design criteria to be implemented for Army projects. This model, when edited for a specific site and project composition, will form the basis for an RFP. Detailed instructions for using the Project Management Manual, for editing the Project Management Manual appendices, and for editing the model solicitation are provided in Chapter 2 of this volume. Please note that contracting guidance contained in this document is provided as an outline and should not be used as a substitute for thorough knowledge of current acquisition regulations. If a conflict arises between this guidance and the acquisition regulations, the acquisition regulations shall govern.
URI: https://yse.yabesh.ir/std/handle/yse/131579
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (2.799Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 4-214-02 CHANGE 1

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T17:08:04Z
date available2017-09-04T17:08:04Z
date copyright09/10/2003
date issued2003
identifier otherBZHPJBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/131579
description abstractPurpose.
This document consolidates into one source the uniform criteria for the planning, design, solicitation, proposal evaluation, and construction of Tactical Equipment Maintenance Facilities. and associated support requirements. It also contains guidance on the use of negotiated, two-phase, designbuild procedures for procurement of new and/or renovated facilities. It provides U.S. Army Corps of Engineers (USACE) Project Architects/Project Engineers (PA/PE), Project Managers (PM) and Major Army Command (MACOM) planners with a single source to guide the process of planning, developing, and executing projects utilizing competitively negotiated source selection processes.
Organization.
This document is organized in two volumes. The first volume, this document, is the Project Management Manual which describes the process of planning, developing, and executing a two phase design-build project. Reference materials supporting the source selection process are provided in the appendices. The second volume is a generic model Request for Proposals (RFP) to be used in developing solicitations. The generic model follows the USACE Standard Contract Format for construction prescribed by EFARS 14.201-1(a)(1), (reference 1-1). The generic model STATEMENT OF WORK (SOW) in Volume II, contains the design criteria to be implemented for Army projects. This model, when edited for a specific site and project composition, will form the basis for an RFP. Detailed instructions for using the Project Management Manual, for editing the Project Management Manual appendices, and for editing the model solicitation are provided in Chapter 2 of this volume. Please note that contracting guidance contained in this document is provided as an outline and should not be used as a substitute for thorough knowledge of current acquisition regulations. If a conflict arises between this guidance and the acquisition regulations, the acquisition regulations shall govern.
languageEnglish
titleUFC 4-214-02 CHANGE 1num
titleARMY TACTICAL EQUIPMENT MAINTENANCE FACILITIES (TEMF)en
typestandard
page355
statusActive
treeUFC - Unified Facilities Criteria:;2003
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian