• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-3617

Lessons Learned - Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Award

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: The Earned Value Management (EVM) requirements, including Contract Performance Report (CPR) reporting, were included in the Constellation Program (CxP) Extravehicular Activity (EVA) Project prime contract. The Prime operated without a Performance Measurement Baseline (PMB) for a year while under letter contract. Letter contract definitization can take months/years to occur, and during that time NASA projects have little insight into contract performance. Additionally, there is a tendency for contractors to delay establishing a PMB, even an interim PMB, prior to contract definitization. Without an interim PMB, it is difficult to determine current performance, assess technical, cost or schedule risks/impacts and planning and control by both the prime contractor and the government is diminished.
URI: https://yse.yabesh.ir/std/handle/yse/132147
Subject: Program Management.
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (59.49Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-3617

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:08:42Z
date available2017-09-04T17:08:42Z
date copyright40877
date issued2011
identifier otherYKWPREAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/132147
description abstractThe Earned Value Management (EVM) requirements, including Contract Performance Report (CPR) reporting, were included in the Constellation Program (CxP) Extravehicular Activity (EVA) Project prime contract. The Prime operated without a Performance Measurement Baseline (PMB) for a year while under letter contract. Letter contract definitization can take months/years to occur, and during that time NASA projects have little insight into contract performance. Additionally, there is a tendency for contractors to delay establishing a PMB, even an interim PMB, prior to contract definitization. Without an interim PMB, it is difficult to determine current performance, assess technical, cost or schedule risks/impacts and planning and control by both the prime contractor and the government is diminished.
languageEnglish
titleNASA-LLIS-3617num
titleLessons Learned - Performance Measurement Baseline (PMB) Implementation Reporting Expectations on Letter Contract Awarden
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsProgram Management.
subject keywordsProgram Management.Acquisition / procurement strategy and planning
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian