• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

AASHTO LRFDCONS-3

LRFD Bridge Construction Specifications - 3rd Edition

Organization:
AASHTO - American Association of State Highway and Transportation Officials
Year: 2010

Abstract: GENERAL
Structure excavation shall consist of the removal of all material, of whatever nature, necessary for the construction of foundations for bridges, retaining walls, and other major structures, in accordance with the contract documents or as directed by the Engineer.
If not otherwise provided for in the contract, structure excavation shall include the furnishing of all necessary equipment and the construction and subsequent removal of all cofferdams, shoring, and water control systems which may be necessary for the execution of the work.
If not otherwise specified in the contract documents, it shall also include the placement of all necessary backfill, including any necessary stockpiling of excavated material which is to be used in backfill, and the disposing of excavated material which is not required for backfill, in roadway embankments or as provided for excess and unsuitable material in Subsection 203.02, AASHTO Guide Specifications for Highway Construction.
If the contract does not include a separate pay item or items for such work, structure excavation shall include all necessary clearing and grubbing and the removal of existing structures within the area to be excavated.
Classification, if any, of excavation will be indicated in the contract documents and set forth in the proposal.
The removal and disposal of buried natural or manmade objects are included in the class of excavation in which they are located, unless such removal and disposal are included in other items of work. However, in the case of a buried man-made object, the removal and disposal of such object will be paid for as extra work and its volume will not be included in the measured quantity of excavation, if:
• its removal requires the use of methods or equipment not used for other excavation on the project,
• its presence was not indicated in the contract drawings,
• its presence could not have been ascertained by site investigation, including contact with identified utilities within the area, and
• the Contractor so requests in writing prior to its removal.
URI: https://yse.yabesh.ir/std/handle/yse/143131
Collections :
  • AASHTO - American Association of State Highway and Transportation Officials
  • Download PDF : (6.691Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    AASHTO LRFDCONS-3

Show full item record

contributor authorAASHTO - American Association of State Highway and Transportation Officials
date accessioned2017-09-04T17:19:54Z
date available2017-09-04T17:19:54Z
date copyright01/01/2010
date issued2010
identifier otherZORBSCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/143131
description abstractGENERAL
Structure excavation shall consist of the removal of all material, of whatever nature, necessary for the construction of foundations for bridges, retaining walls, and other major structures, in accordance with the contract documents or as directed by the Engineer.
If not otherwise provided for in the contract, structure excavation shall include the furnishing of all necessary equipment and the construction and subsequent removal of all cofferdams, shoring, and water control systems which may be necessary for the execution of the work.
If not otherwise specified in the contract documents, it shall also include the placement of all necessary backfill, including any necessary stockpiling of excavated material which is to be used in backfill, and the disposing of excavated material which is not required for backfill, in roadway embankments or as provided for excess and unsuitable material in Subsection 203.02, AASHTO Guide Specifications for Highway Construction.
If the contract does not include a separate pay item or items for such work, structure excavation shall include all necessary clearing and grubbing and the removal of existing structures within the area to be excavated.
Classification, if any, of excavation will be indicated in the contract documents and set forth in the proposal.
The removal and disposal of buried natural or manmade objects are included in the class of excavation in which they are located, unless such removal and disposal are included in other items of work. However, in the case of a buried man-made object, the removal and disposal of such object will be paid for as extra work and its volume will not be included in the measured quantity of excavation, if:
• its removal requires the use of methods or equipment not used for other excavation on the project,
• its presence was not indicated in the contract drawings,
• its presence could not have been ascertained by site investigation, including contact with identified utilities within the area, and
• the Contractor so requests in writing prior to its removal.
languageEnglish
titleAASHTO LRFDCONS-3num
titleLRFD Bridge Construction Specifications - 3rd Editionen
typestandard
page542
statusRevised
treeAASHTO - American Association of State Highway and Transportation Officials:;2010
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian