• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 1-300-07A

DESIGN BUILD TECHNICAL REQUIREMENTS

Organization:
UFC - Unified Facilities Criteria
Year: 2005

Abstract: PURPOSE.
The primary intent of this document is to provide instructions for preparing technical specifications contained in a Request for Proposal (RFP).
a. Specifically, this Architectural and Engineering Instructions (AEI) will:
(1) Ensure that RFP technical specifications for Design-Build (D-B) construction projects clearly define program/project requirements, performance attributes, performance factors, submittal procedures, as well as other mandatory requirements such as building envelopes. The Design-Build process can be applied to all types, sizes, and complexities of projects. This instruction focuses on the technical preparation of RFP’s issued for D-B projects such as barracks, administration facilities, hangers, pavement, site preparation, and similar projects. The AEI, “Army Family Housing," provides instructions for family housing projects.
(2) Ensure Corps of Engineers′ districts using D-B contracting methods have instituted good requirements in their Design-Build process so that D-B contractors incorporate public laws, executive orders, and mandatory design inputs into the final constructed product. These requirements should ensure all facilities are designed and constructed with the equivalent quality of traditional Corps of Engineers’ constructed facilities.
(3) Identify mandatory Federal, technical, regulatory, fire protection, life safety code, and quality requirements that must be included in the RFP technical specifications.
(4) Establish a consistency in Corps of Engineers’ prepared Design-Build RFP’s.
(5) Provide the Corps of Engineers′ designers with an understanding of their involvement in the D-B process so they can contribute to the corporate approach for D-B acquisition.
URI: https://yse.yabesh.ir/std/handle/yse/176771
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (268.5Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 1-300-07A

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T17:53:34Z
date available2017-09-04T17:53:34Z
date copyright03/01/2005
date issued2005
identifier otherFEXOJBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/176771
description abstractPURPOSE.
The primary intent of this document is to provide instructions for preparing technical specifications contained in a Request for Proposal (RFP).
a. Specifically, this Architectural and Engineering Instructions (AEI) will:
(1) Ensure that RFP technical specifications for Design-Build (D-B) construction projects clearly define program/project requirements, performance attributes, performance factors, submittal procedures, as well as other mandatory requirements such as building envelopes. The Design-Build process can be applied to all types, sizes, and complexities of projects. This instruction focuses on the technical preparation of RFP’s issued for D-B projects such as barracks, administration facilities, hangers, pavement, site preparation, and similar projects. The AEI, “Army Family Housing," provides instructions for family housing projects.
(2) Ensure Corps of Engineers′ districts using D-B contracting methods have instituted good requirements in their Design-Build process so that D-B contractors incorporate public laws, executive orders, and mandatory design inputs into the final constructed product. These requirements should ensure all facilities are designed and constructed with the equivalent quality of traditional Corps of Engineers’ constructed facilities.
(3) Identify mandatory Federal, technical, regulatory, fire protection, life safety code, and quality requirements that must be included in the RFP technical specifications.
(4) Establish a consistency in Corps of Engineers’ prepared Design-Build RFP’s.
(5) Provide the Corps of Engineers′ designers with an understanding of their involvement in the D-B process so they can contribute to the corporate approach for D-B acquisition.
languageEnglish
titleUFC 1-300-07Anum
titleDESIGN BUILD TECHNICAL REQUIREMENTSen
typestandard
page71
statusActive
treeUFC - Unified Facilities Criteria:;2005
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian