• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 1-300-09N CHANGE 8

DESIGN PROCEDURES

Organization:
UFC - Unified Facilities Criteria
Year: 2011

Abstract: PURPOSE AND SCOPE.
This UFC provides policy and standards for the design, development, and revision of project documents, including drawings, specifications, and Requests for Proposal, for facilities under the cognizance of NAVFAC. This UFC has been developed to ensure consistency and clarity of project documents that form the basis of contracts for the design and construction of facilities.
URI: https://yse.yabesh.ir/std/handle/yse/185690
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (526.0Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 1-300-09N CHANGE 8

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T18:02:45Z
date available2017-09-04T18:02:45Z
date copyright02/17/2011
date issued2011
identifier otherGCMTXEAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/185690
description abstractPURPOSE AND SCOPE.
This UFC provides policy and standards for the design, development, and revision of project documents, including drawings, specifications, and Requests for Proposal, for facilities under the cognizance of NAVFAC. This UFC has been developed to ensure consistency and clarity of project documents that form the basis of contracts for the design and construction of facilities.
languageEnglish
titleUFC 1-300-09N CHANGE 8num
titleDESIGN PROCEDURESen
typestandard
page90
statusActive
treeUFC - Unified Facilities Criteria:;2011
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian