• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 4-721-11.1 CHANGE 1

UNACCOMPANIED ENLISTED PERSONNEL HOUSING (UEPH) COMPLEXES

Organization:
UFC - Unified Facilities Criteria
Year: 2002

Abstract: Purpose. This document consolidates into one source the uniform criteria for the planning, design, solicitation, proposal evaluation, and construction of Unaccompanied Enlisted Personnel Housing (UEPH) Complexes and associated support requirements. It also contains guidance on the use of negotiated, two-phase, design-build procedures for procurement of new and/or renovated facilities. It provides U.S. Army Corps of Engineers (USACE) Project Architects/Project Engineers (PA/PE), Project Managers (PM) and Major Army Command (MACOM) planners with a single source to guide the process of planning, developing, and executing UEPH Complexes utilizing competitively negotiated source selection processes.
Organization. This document is organized in two volumes. The first volume, this document, is the Project Management Manual which describes the process of planning, developing, and executing a two phase design-build project. Reference materials supporting the source selection process are provided in the appendices. The second volume is a generic model Request for Proposals (RFP) to be used in developing solicitations for UEPH Complex Facilities and associated support requirements. The generic model follows the USACE Standard Contract Format for construction prescribed by EFARS 14.201- 1(a)(1), (reference 1-1). The generic model STATEMENT OF WORK (SOW) in Volume II, contains the design criteria to be implemented for Army projects. This model, when edited for a specific site and project composition, will form the basis for an RFP. Detailed instructions for using the Project Management Manual, for editing the Project Management Manual appendices, and for editing the model solicitation are provided in Chapter 2 of this volume. Please note that contracting guidance contained in this document is provided as an outline and should not be used as a substitute for thorough knowledge of current acquisition regulations. If a conflict arises between this guidance and the acquisition regulations, the acquisition regulations shall govern.
URI: https://yse.yabesh.ir/std/handle/yse/186026
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (2.881Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 4-721-11.1 CHANGE 1

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T18:03:05Z
date available2017-09-04T18:03:05Z
date copyright37561
date issued2002
identifier otherGDIPJBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/186026
description abstractPurpose. This document consolidates into one source the uniform criteria for the planning, design, solicitation, proposal evaluation, and construction of Unaccompanied Enlisted Personnel Housing (UEPH) Complexes and associated support requirements. It also contains guidance on the use of negotiated, two-phase, design-build procedures for procurement of new and/or renovated facilities. It provides U.S. Army Corps of Engineers (USACE) Project Architects/Project Engineers (PA/PE), Project Managers (PM) and Major Army Command (MACOM) planners with a single source to guide the process of planning, developing, and executing UEPH Complexes utilizing competitively negotiated source selection processes.
Organization. This document is organized in two volumes. The first volume, this document, is the Project Management Manual which describes the process of planning, developing, and executing a two phase design-build project. Reference materials supporting the source selection process are provided in the appendices. The second volume is a generic model Request for Proposals (RFP) to be used in developing solicitations for UEPH Complex Facilities and associated support requirements. The generic model follows the USACE Standard Contract Format for construction prescribed by EFARS 14.201- 1(a)(1), (reference 1-1). The generic model STATEMENT OF WORK (SOW) in Volume II, contains the design criteria to be implemented for Army projects. This model, when edited for a specific site and project composition, will form the basis for an RFP. Detailed instructions for using the Project Management Manual, for editing the Project Management Manual appendices, and for editing the model solicitation are provided in Chapter 2 of this volume. Please note that contracting guidance contained in this document is provided as an outline and should not be used as a substitute for thorough knowledge of current acquisition regulations. If a conflict arises between this guidance and the acquisition regulations, the acquisition regulations shall govern.
languageEnglish
titleUFC 4-721-11.1 CHANGE 1num
titleUNACCOMPANIED ENLISTED PERSONNEL HOUSING (UEPH) COMPLEXESen
typestandard
page399
statusActive
treeUFC - Unified Facilities Criteria:;2002
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian