• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  •   YSE
  • Industrial Standards
  • UFC - Unified Facilities Criteria
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

UFC 3-410-02N

HEATING, VENTILATING, AIR CONDITIONING, AND DEHUMIDIFYING SYSTEMS

Organization:
UFC - Unified Facilities Criteria
Year: 2005

Abstract: PURPOSE AND SCOPE.
This UFC is comprised of two sections. Chapter 1 introduces this UFC. Appendix A contains the full text copy of the previously released Military Handbook (MIL-HDBK) 1003/3. This UFC serves as criteria until such time as the full text UFC is developed from the MIL-HDBK and other sources. This UFC provides general criteria for the design of passive solar buildings.
APPLICABILITY.
This UFC applies to all Navy service elements and Navy contractors.
General Building Requirements.
All DoD facilities must comply with UFC 1-200-01, Design: General Building Requirements. If any conflict occurs between this UFC and UFC 1-200-01, the requirements of UFC 1-200-01 take precedence.
Safety.
All DoD facilities must comply with DODINST 6055.1 and applicable Occupational Safety and Health Administration (OSHA) safety and health standards.
NOTE: All NAVY projects, must comply with OPNAVINST 5100.23 (series), Navy Occupational Safety and Health Program Manual. The most recent publication in this series can be accessed at the NAVFAC Safety web site:
www.navfac.navy.mil/safety/pub.htm. If any conflict occurs between this UFC and OPNAVINST 5100.23, the requirements of OPNAVINST 5100.23 take precedence.
Fire Protection.
All DoD facilities must comply with UFC 3-600-01, Design: Fire Protection Engineering for Facilities. If any conflict occurs between this UFC and UFC 3-600-01, the requirements of UFC 3-600-01 take precedence.
Antiterrorism/Force Protection.
All DoD facilities must comply with UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for Buildings. If any conflict occurs between this UFC and UFC 4-010-01, the requirements of UFC 4-010-01 take precedence.
Humid Area HVAC Design.
Navy facilities must comply with the requirements in ITG FY05-2, NAVFAC Humid Area HVAC Design Criteria.
URI: https://yse.yabesh.ir/std/handle/yse/188104
Collections :
  • UFC - Unified Facilities Criteria
  • Download PDF : (1.326Mb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    UFC 3-410-02N

Show full item record

contributor authorUFC - Unified Facilities Criteria
date accessioned2017-09-04T18:05:08Z
date available2017-09-04T18:05:08Z
date copyright06/08/2005
date issued2005
identifier otherGIYOJBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/188104
description abstractPURPOSE AND SCOPE.
This UFC is comprised of two sections. Chapter 1 introduces this UFC. Appendix A contains the full text copy of the previously released Military Handbook (MIL-HDBK) 1003/3. This UFC serves as criteria until such time as the full text UFC is developed from the MIL-HDBK and other sources. This UFC provides general criteria for the design of passive solar buildings.
APPLICABILITY.
This UFC applies to all Navy service elements and Navy contractors.
General Building Requirements.
All DoD facilities must comply with UFC 1-200-01, Design: General Building Requirements. If any conflict occurs between this UFC and UFC 1-200-01, the requirements of UFC 1-200-01 take precedence.
Safety.
All DoD facilities must comply with DODINST 6055.1 and applicable Occupational Safety and Health Administration (OSHA) safety and health standards.
NOTE: All NAVY projects, must comply with OPNAVINST 5100.23 (series), Navy Occupational Safety and Health Program Manual. The most recent publication in this series can be accessed at the NAVFAC Safety web site:
www.navfac.navy.mil/safety/pub.htm. If any conflict occurs between this UFC and OPNAVINST 5100.23, the requirements of OPNAVINST 5100.23 take precedence.
Fire Protection.
All DoD facilities must comply with UFC 3-600-01, Design: Fire Protection Engineering for Facilities. If any conflict occurs between this UFC and UFC 3-600-01, the requirements of UFC 3-600-01 take precedence.
Antiterrorism/Force Protection.
All DoD facilities must comply with UFC 4-010-01, Design: DoD Minimum Antiterrorism Standards for Buildings. If any conflict occurs between this UFC and UFC 4-010-01, the requirements of UFC 4-010-01 take precedence.
Humid Area HVAC Design.
Navy facilities must comply with the requirements in ITG FY05-2, NAVFAC Humid Area HVAC Design Criteria.
languageEnglish
titleUFC 3-410-02Nnum
titleHEATING, VENTILATING, AIR CONDITIONING, AND DEHUMIDIFYING SYSTEMSen
typestandard
page234
statusActive
treeUFC - Unified Facilities Criteria:;2005
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian