description abstractPainting Bare Steel
a.Shop Painting
For the purposes of this Guide, repainting steel from an existing bridge that is returned to a shop qualified to clean existing steel by blast cleaning to an acceptable surface condition (see section 11) and recoating is subject to the same requirements as newly fabricated steel.
A shop may be either a permanent painting shop that may be part of a steel fabricator's plant, a separate painting shop, or a temporary shop constructed at or near the bridge site to repaint the steel where environmental conditions during paint application will be within the recommended temperature and humidity ranges. A covered shelter does not necessarily constitute a shop.
The shop-applied coating may include an initial coat or multiple coats as specified by the Owner or, if acceptable to the Owner, as elected by the Contractor.
b. Field Painting
This Guide contains requirements, including applicable environmental regulations, for the Contractor to meet, when field painting of new structural steel is specified or allowed.
languageEnglish
titleAASHTO GPSS-1num
titleGuide for Painting Steel Structuresen
typestandard
page98
statusWithdrawn
treeAASHTO - American Association of State Highway and Transportation Officials:;1997
contenttypefulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record