• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  •   YSE
  • Industrial Standards
  • AASHTO - American Association of State Highway and Transportation Officials
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

AASHTO HB-17 DIVISION II SEC 4

Division II Construction - Driven Foundation Piles

Organization:
AASHTO - American Association of State Highway and Transportation Officials
Year: 2002

Abstract: DESCRIPTION
This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles when required. This specification also covers providing test piles and performing loading tests. Piling shall conform to and be installed in accordance with these specifications, and at the location, and to the elevation, penetration, and bearing capacity shown on the plans or as directed by the Engineer.
Any improperly driven, broken, or otherwise defective pile shall be corrected to the satisfaction of the Engineer by removal and replacement, or the driving of an additional pile, at no extra cost.
Except when test piles are required, the Contractor shall furnish the piles in accordance with the dimensions shown on the plans or special provisions. When test piles are required, the pile lengths shown on the plans are for estimating purposes only and the actual lengths to be furnished for production piles will be determined by the Engineer after the test piles have been driven. The lengths given in the Engineer's order list will include only the lengths anticipated for use in the completed structure. The Contractor shall, without added compensation, increase the lengths shown or ordered to provide for fresh heading and for such additional length as may be necessary to suit the method of operation.
URI: https://yse.yabesh.ir/std/handle/yse/200290
Collections :
  • AASHTO - American Association of State Highway and Transportation Officials
  • Download PDF : (832.9Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    AASHTO HB-17 DIVISION II SEC 4

Show full item record

contributor authorAASHTO - American Association of State Highway and Transportation Officials
date accessioned2017-09-04T18:17:27Z
date available2017-09-04T18:17:27Z
date copyright01/01/2002
date issued2002
identifier otherHPGOBBAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/200290
description abstractDESCRIPTION
This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles when required. This specification also covers providing test piles and performing loading tests. Piling shall conform to and be installed in accordance with these specifications, and at the location, and to the elevation, penetration, and bearing capacity shown on the plans or as directed by the Engineer.
Any improperly driven, broken, or otherwise defective pile shall be corrected to the satisfaction of the Engineer by removal and replacement, or the driving of an additional pile, at no extra cost.
Except when test piles are required, the Contractor shall furnish the piles in accordance with the dimensions shown on the plans or special provisions. When test piles are required, the pile lengths shown on the plans are for estimating purposes only and the actual lengths to be furnished for production piles will be determined by the Engineer after the test piles have been driven. The lengths given in the Engineer's order list will include only the lengths anticipated for use in the completed structure. The Contractor shall, without added compensation, increase the lengths shown or ordered to provide for fresh heading and for such additional length as may be necessary to suit the method of operation.
languageEnglish
titleAASHTO HB-17 DIVISION II SEC 4num
titleDivision II Construction - Driven Foundation Pilesen
typestandard
page9
statusActive
treeAASHTO - American Association of State Highway and Transportation Officials:;2002
contenttypefulltext
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian