• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-0041

Lessons Learned - Emergency Power-Down Procedures for Multiple Fuel Cells; Fuel Cell Helium Ingestion; Crew Module Fire Alarm and/or Electrical Component Activations; Vehicle Data Down Link

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 1991

Abstract: Description of Driving Event:
Fuel cells are connected to the orbiter power busses via a motorized switch. OMI emergency procedures for powering down fuel cells assume redundant ground power is connected to the orbiter and calls for only one disconnect sequence fuel cell 1, 2, then 3. The power to disconnect the FC is delivered through the same busses they are being disconnected from. During a multiple fc failure (i.e. FC 2 & 3) with no ground power connected, the OMI requires FC 1 to be disconnected first. Since FC 1 was the only one operating correctly and suppling the busses with power, switching it off first removed the power needed to disconnect the rest.
URI: https://yse.yabesh.ir/std/handle/yse/4022
Subject: Configuration Management
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (14.65Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-0041

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T15:06:32Z
date available2017-09-04T15:06:32Z
date copyright33567
date issued1991
identifier otherLEYCQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/4022
description abstractDescription of Driving Event:
Fuel cells are connected to the orbiter power busses via a motorized switch. OMI emergency procedures for powering down fuel cells assume redundant ground power is connected to the orbiter and calls for only one disconnect sequence fuel cell 1, 2, then 3. The power to disconnect the FC is delivered through the same busses they are being disconnected from. During a multiple fc failure (i.e. FC 2 & 3) with no ground power connected, the OMI requires FC 1 to be disconnected first. Since FC 1 was the only one operating correctly and suppling the busses with power, switching it off first removed the power needed to disconnect the rest.
languageEnglish
titleNASA-LLIS-0041num
titleLessons Learned - Emergency Power-Down Procedures for Multiple Fuel Cells; Fuel Cell Helium Ingestion; Crew Module Fire Alarm and/or Electrical Component Activations; Vehicle Data Down Linken
typestandard
page3
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;1991
contenttypefulltext
subject keywordsConfiguration Management
subject keywordsEnergetic Materials - Explosive/Propellant/Pyrotechnic
subject keywordsEnergy
subject keywordsGround Equipment
subject keywordsGround Operations
subject keywordsHardware
subject keywordsLaunch Vehicle
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian