NASA-LLIS-0041
Lessons Learned - Emergency Power-Down Procedures for Multiple Fuel Cells; Fuel Cell Helium Ingestion; Crew Module Fire Alarm and/or Electrical Component Activations; Vehicle Data Down Link
Year: 1991
Abstract: Description of Driving Event:
Fuel cells are connected to the orbiter power busses via a motorized switch. OMI emergency procedures for powering down fuel cells assume redundant ground power is connected to the orbiter and calls for only one disconnect sequence fuel cell 1, 2, then 3. The power to disconnect the FC is delivered through the same busses they are being disconnected from. During a multiple fc failure (i.e. FC 2 & 3) with no ground power connected, the OMI requires FC 1 to be disconnected first. Since FC 1 was the only one operating correctly and suppling the busses with power, switching it off first removed the power needed to disconnect the rest.
Fuel cells are connected to the orbiter power busses via a motorized switch. OMI emergency procedures for powering down fuel cells assume redundant ground power is connected to the orbiter and calls for only one disconnect sequence fuel cell 1, 2, then 3. The power to disconnect the FC is delivered through the same busses they are being disconnected from. During a multiple fc failure (i.e. FC 2 & 3) with no ground power connected, the OMI requires FC 1 to be disconnected first. Since FC 1 was the only one operating correctly and suppling the busses with power, switching it off first removed the power needed to disconnect the rest.
Subject: Configuration Management
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T15:06:32Z | |
| date available | 2017-09-04T15:06:32Z | |
| date copyright | 33567 | |
| date issued | 1991 | |
| identifier other | LEYCQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/4022 | |
| description abstract | Description of Driving Event: Fuel cells are connected to the orbiter power busses via a motorized switch. OMI emergency procedures for powering down fuel cells assume redundant ground power is connected to the orbiter and calls for only one disconnect sequence fuel cell 1, 2, then 3. The power to disconnect the FC is delivered through the same busses they are being disconnected from. During a multiple fc failure (i.e. FC 2 & 3) with no ground power connected, the OMI requires FC 1 to be disconnected first. Since FC 1 was the only one operating correctly and suppling the busses with power, switching it off first removed the power needed to disconnect the rest. | |
| language | English | |
| title | NASA-LLIS-0041 | num |
| title | Lessons Learned - Emergency Power-Down Procedures for Multiple Fuel Cells; Fuel Cell Helium Ingestion; Crew Module Fire Alarm and/or Electrical Component Activations; Vehicle Data Down Link | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;1991 | |
| contenttype | fulltext | |
| subject keywords | Configuration Management | |
| subject keywords | Energetic Materials - Explosive/Propellant/Pyrotechnic | |
| subject keywords | Energy | |
| subject keywords | Ground Equipment | |
| subject keywords | Ground Operations | |
| subject keywords | Hardware | |
| subject keywords | Launch Vehicle |