• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-1313

Lessons Learned – Tailoring Project Management Review and Approval Processes Based on Project Requirements

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2002

Abstract: Description of Driving Event:
In addition to "normal" tight budgets, schedules and technical requirements, the Project had several constraints and conditions that posed additional challenges including:
1. Small "one person deep" team
2. Multi-institutional team consisting of Government and Industry
3. Multiple sites (test vehicles assembled at Contractors site were transported to Dryden Flight Research Center for operation)
4. Classified security requirements
The Project used these challenges to streamline its processes by tailoring the existing Government and Contractor procedures, polices, and requirements to fit the specific needs of the Project.
URI: https://yse.yabesh.ir/std/handle/yse/67206
Subject: Administration/Organization
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (13.28Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-1313

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T16:03:52Z
date available2017-09-04T16:03:52Z
date copyright01/01/2002
date issued2002
identifier otherRRVEQCAAAAAAAAAA.pdf
identifier urihttps://yse.yabesh.ir/std/handle/yse/67206
description abstractDescription of Driving Event:
In addition to "normal" tight budgets, schedules and technical requirements, the Project had several constraints and conditions that posed additional challenges including:
1. Small "one person deep" team
2. Multi-institutional team consisting of Government and Industry
3. Multiple sites (test vehicles assembled at Contractors site were transported to Dryden Flight Research Center for operation)
4. Classified security requirements
The Project used these challenges to streamline its processes by tailoring the existing Government and Contractor procedures, polices, and requirements to fit the specific needs of the Project.
languageEnglish
titleNASA-LLIS-1313num
titleLessons Learned – Tailoring Project Management Review and Approval Processes Based on Project Requirementsen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2002
contenttypefulltext
subject keywordsAdministration/Organization
subject keywordsPolicy & Planning
subject keywordsRisk Management/Assessment
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian