Abstract: Abstract:
During welding operations at the E-Complex in support of the Full-Volume RP Construction Project at Stennis Space Center, a fire occurred as a result of welding/cutting operations being performed on Level 5 of the E-1 Test Stand. The Mishap Investigation Team concluded that the proximate cause of this Type C incident was hot welding slag igniting combustible material under and near the vicinity of the welding/cutting operation. Contractor failure to follow procedures associated with hot work permits due to schedule pressure contributed to the incident, as well as lack of training and overburdened supervisory personnel.
During welding operations at the E-Complex in support of the Full-Volume RP Construction Project at Stennis Space Center, a fire occurred as a result of welding/cutting operations being performed on Level 5 of the E-1 Test Stand. The Mishap Investigation Team concluded that the proximate cause of this Type C incident was hot welding slag igniting combustible material under and near the vicinity of the welding/cutting operation. Contractor failure to follow procedures associated with hot work permits due to schedule pressure contributed to the incident, as well as lack of training and overburdened supervisory personnel.
Subject: Accident Investigation
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T16:23:08Z | |
| date available | 2017-09-04T16:23:08Z | |
| date copyright | 02/17/2005 | |
| date issued | 2005 | |
| identifier other | TRWEQCAAAAAAAAAA.pdf | |
| identifier uri | https://yse.yabesh.ir/std/handle/yse/86499 | |
| description abstract | Abstract: During welding operations at the E-Complex in support of the Full-Volume RP Construction Project at Stennis Space Center, a fire occurred as a result of welding/cutting operations being performed on Level 5 of the E-1 Test Stand. The Mishap Investigation Team concluded that the proximate cause of this Type C incident was hot welding slag igniting combustible material under and near the vicinity of the welding/cutting operation. Contractor failure to follow procedures associated with hot work permits due to schedule pressure contributed to the incident, as well as lack of training and overburdened supervisory personnel. | |
| language | English | |
| title | NASA-LLIS-1517 | num |
| title | Lessons Learned - Test Stand E-1 Mishap | en |
| type | standard | |
| page | 4 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2005 | |
| contenttype | fulltext | |
| subject keywords | Accident Investigation | |
| subject keywords | Emergency Preparedness | |
| subject keywords | Energetic Materials - Explosive/Propellant/Pyrotechnic | |
| subject keywords | Fire Protection | |
| subject keywords | Human Factors | |
| subject keywords | Policy & Planning | |
| subject keywords | Risk Management/Assessment | |
| subject keywords | Safety & Mission Assurance | |
| subject keywords | Test Facility |