Abstract: When fuel cell power plants (FCPs) were developed for the Space Shuttle, KSC had minimal capability to repair them. As a result, even FCPs needing only minor repairs had to be returned to the vendor for repair. In the future, FCPs should be designed to maximize the use of modular components and other features that would allow a significant portion of necessary repair work (including component replacement) to be performed at KSC. This would include components in the accessory section and single cells or fuel cell stacks. Performing these repairs at KSC would eliminate the need to send entire power plants back to the vendor. KSC could save time and money by using modular FCPs that KSC workers can repair.
Subject: Acquisition / procurement strategy and planning
Show full item record
| contributor author | NASA - National Aeronautics and Space Administration (NASA) | |
| date accessioned | 2017-09-04T17:38:07Z | |
| date available | 2017-09-04T17:38:07Z | |
| date copyright | 08/14/2010 | |
| date issued | 2010 | |
| identifier other | DOYEOEAAAAAAAAAA.pdf | |
| identifier uri | http://yse.yabesh.ir/std/handle/yse/161033 | |
| description abstract | When fuel cell power plants (FCPs) were developed for the Space Shuttle, KSC had minimal capability to repair them. As a result, even FCPs needing only minor repairs had to be returned to the vendor for repair. In the future, FCPs should be designed to maximize the use of modular components and other features that would allow a significant portion of necessary repair work (including component replacement) to be performed at KSC. This would include components in the accessory section and single cells or fuel cell stacks. Performing these repairs at KSC would eliminate the need to send entire power plants back to the vendor. KSC could save time and money by using modular FCPs that KSC workers can repair. | |
| language | English | |
| title | NASA-LLIS-5477 | num |
| title | Lessons Learned - Enhanced Fuel Cell Repair Capability at KSC | en |
| type | standard | |
| page | 3 | |
| status | Active | |
| tree | NASA - National Aeronautics and Space Administration (NASA):;2010 | |
| contenttype | fulltext | |
| subject keywords | Acquisition / procurement strategy and planning | |
| subject keywords | Cryogenic Systems | |
| subject keywords | Engineering design and project processes and standards | |
| subject keywords | Ground processing and manifesting | |
| subject keywords | Ground support systems | |
| subject keywords | Human factors planning | |
| subject keywords | Launch Vehicle | |
| subject keywords | Parts | |
| subject keywords | Materials | |
| subject keywords | & Processes | |
| subject keywords | Power | |
| subject keywords | Requirements critical to costing and cost credibility |