• 0
    • ارسال درخواست
    • حذف همه
    • Industrial Standards
    • Defence Standards
  • درباره ما
  • درخواست موردی
  • فهرست استانداردها
    • Industrial Standards
    • Defence Standards
  • راهنما
  • Login
  • لیست خرید شما 0
    • ارسال درخواست
    • حذف همه
View Item 
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  •   YSE
  • Defence Standards
  • NASA - National Aeronautics and Space Administration (NASA)
  • View Item
  • All Fields
  • Title(or Doc Num)
  • Organization
  • Year
  • Subject
Advanced Search
JavaScript is disabled for your browser. Some features of this site may not work without it.

Archive

NASA-LLIS-5156

Lessons Learned – Pad-39A Sandblast Pot Mishap

Organization:
NASA - National Aeronautics and Space Administration (NASA)
Year: 2011

Abstract: Abstract:
A worker disconnected a hose from the vent pipe attached to a sandblast pot, the stored pressure energy in the pot caused the pipe to spin, and the worker was struck several times by the spinning vent pipe. The injured worker and several others involved in the sandblasting operation were employed under a subcontract to perform corrosion control, including sandblasting and painting. The oversight of equipment configuration and operations delegated to subcontractors can lead to unsafe operations. All pressure system maintenance should be performed by approved procedures that ensure configuration control and prime contractors should explicitly identify in their subcontracts the maintenance that subcontractors are authorized to perform without obtaining prime-contractor approval.
URI: http://yse.yabesh.ir/std/handle/yse/178373
Subject: Acquisition / Procurement Strategy and Planning
Collections :
  • NASA - National Aeronautics and Space Administration (NASA)
  • Download PDF : (93.27Kb)
  • Show Full MetaData Hide Full MetaData
  • Statistics

    NASA-LLIS-5156

Show full item record

contributor authorNASA - National Aeronautics and Space Administration (NASA)
date accessioned2017-09-04T17:55:16Z
date available2017-09-04T17:55:16Z
date copyright02/16/2011
date issued2011
identifier otherFJHOEEAAAAAAAAAA.pdf
identifier urihttp://yse.yabesh.ir/std/handle/yse/178373
description abstractAbstract:
A worker disconnected a hose from the vent pipe attached to a sandblast pot, the stored pressure energy in the pot caused the pipe to spin, and the worker was struck several times by the spinning vent pipe. The injured worker and several others involved in the sandblasting operation were employed under a subcontract to perform corrosion control, including sandblasting and painting. The oversight of equipment configuration and operations delegated to subcontractors can lead to unsafe operations. All pressure system maintenance should be performed by approved procedures that ensure configuration control and prime contractors should explicitly identify in their subcontracts the maintenance that subcontractors are authorized to perform without obtaining prime-contractor approval.
languageEnglish
titleNASA-LLIS-5156num
titleLessons Learned – Pad-39A Sandblast Pot Mishapen
typestandard
page2
statusActive
treeNASA - National Aeronautics and Space Administration (NASA):;2011
contenttypefulltext
subject keywordsAcquisition / Procurement Strategy and Planning
subject keywordsCommunications between Different Offices and Contractor Personnel
subject keywordsConfiguration Change Control
subject keywordsContractor Relationships
subject keywordsFacilities
subject keywordsMaintenance
subject keywordsPressure Vessels
subject keywordsReview systems and boards
subject keywordsRisk Management
subject keywordsRole of Civil Service Technical Staff versus Contractor Staff
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian
 
DSpace software copyright © 2017-2020  DuraSpace
نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
yabeshDSpacePersian